Avan Teknik specifies, supplies and services biogas equipment across the Nordic region — as an independent technical advisor to authorities and industry, and as the Nordic partner for international suppliers.

The whole chain

From a pile of substrate to power on the grid.

Five steps. We work with all of them — and the colour of each step follows that stream through the rest of this page.

  1. 01

    Feedstock

    Manure, food waste, crop residues. What goes in decides everything that comes after it.

  2. 02

    Digester

    Bacteria break the substrate down without oxygen, at a held temperature, over several weeks.

  3. 03

    Raw biogas

    Mostly methane and carbon dioxide, plus water and traces that have to be taken out.

  4. 04

    Engine or upgrading

    Burn it in a CHP engine, or clean it to biomethane. Two different plants, one decision.

  5. 05

    Power, heat, fuel

    Electricity and heat from the engine. Grid gas or vehicle fuel from the upgrading unit.

What we supply

Engines, plant, upgrading.

Four lines, one discipline. We represent the suppliers, commission the equipment, and keep it running afterwards.

Biogas in03 Heat exchanger04 Flue gas Power out01 Gas engine02 GeneratorHeat recovery CHP moduleFig. 02
CHP

Gas engines

Combined heat and power units sized for biogas. We represent the suppliers, commission the units on site, and hand over a plant that runs.

  • Engine
  • Installation
  • Commissioning
01 Feedstock02 Digester03 Gas holderGas out DigestateAD plantFig. 03
AD plant

Anaerobic digestion

Digester, substrate handling and gas train, specified for the feedstock you actually have rather than a catalogue case.

  • Feasibility
  • Specification
  • Tender review
01 Raw gas in02 Compressor03 Cooler04 Membrane skid BiomethaneCO2 off-gas Upgrading unitFig. 04
Upgrading

Raw gas to biomethane

Upgrading to grid or vehicle fuel quality. Ask for the figures on the configuration you plan — we give them with the test conditions behind them.

  • Upgrading skid
  • Gas spec
  • Performance test
01 Stock02 Wear parts03 Overhaul Detail ASpares and serviceFig. 06
Service

Spare parts and uptime

Parts, planned maintenance and technical support for the equipment we deliver. An engine that stops on a Friday is our problem too.

  • Spare parts
  • Service plan
  • Support
Process

Where we come in.

Step 01

Feasibility

Substrate, siting and permits. What the plant can realistically deliver, and whether it should be built at all.

Step 02

Procurement

Specification, tender review and supplier assessment, with the trade-offs written down.

Step 03

Commissioning

Installation oversight, start-up and performance verification against what was promised.

Step 04

Service

Spares, planned maintenance and the technical support that keeps the plant producing.

Independent review

Two roles, kept separate on purpose.

When we review someone else's plant, we have no equipment interest in the outcome. When we sell equipment, we say so plainly. The two never run on the same project without the client knowing.

Consultancy

Feasibility, specification and verification for authorities and industry. Paid for the judgement, not the hardware.

Representation

Nordic partner and service organisation for international suppliers. Paid for the hardware, and for keeping it running.

01 Plan review02 Detail FeasibilitySpecificationVerification ScopeIndependent reviewFig. 05
Contact

Tell us the configuration.

Feedstock, capacity and what you want out of the gas. That is enough for a first answer. Book a time, or write to us.

Write to us

info@avantk.com

Three lines are enough to start: the feedstock, the capacity you are planning for, and what you want out of the gas.