Gas engines
Combined heat and power units sized for biogas. We represent the suppliers, commission the units on site, and hand over a plant that runs.
- Engine
- Installation
- Commissioning
Avan Teknik specifies, supplies and services biogas equipment across the Nordic region — as an independent technical advisor to authorities and industry, and as the Nordic partner for international suppliers.
Five steps. We work with all of them — and the colour of each step follows that stream through the rest of this page.
Manure, food waste, crop residues. What goes in decides everything that comes after it.
Bacteria break the substrate down without oxygen, at a held temperature, over several weeks.
Mostly methane and carbon dioxide, plus water and traces that have to be taken out.
Burn it in a CHP engine, or clean it to biomethane. Two different plants, one decision.
Electricity and heat from the engine. Grid gas or vehicle fuel from the upgrading unit.
Four lines, one discipline. We represent the suppliers, commission the equipment, and keep it running afterwards.
Combined heat and power units sized for biogas. We represent the suppliers, commission the units on site, and hand over a plant that runs.
Digester, substrate handling and gas train, specified for the feedstock you actually have rather than a catalogue case.
Upgrading to grid or vehicle fuel quality. Ask for the figures on the configuration you plan — we give them with the test conditions behind them.
Parts, planned maintenance and technical support for the equipment we deliver. An engine that stops on a Friday is our problem too.
Substrate, siting and permits. What the plant can realistically deliver, and whether it should be built at all.
Specification, tender review and supplier assessment, with the trade-offs written down.
Installation oversight, start-up and performance verification against what was promised.
Spares, planned maintenance and the technical support that keeps the plant producing.
When we review someone else's plant, we have no equipment interest in the outcome. When we sell equipment, we say so plainly. The two never run on the same project without the client knowing.
Feasibility, specification and verification for authorities and industry. Paid for the judgement, not the hardware.
Nordic partner and service organisation for international suppliers. Paid for the hardware, and for keeping it running.
Feedstock, capacity and what you want out of the gas. That is enough for a first answer. Book a time, or write to us.
info@avantk.com
Three lines are enough to start: the feedstock, the capacity you are planning for, and what you want out of the gas.